Conceptboard now brings Azure directly to your boards. Import your Azure tickets as tasks, manage status and assignees, and keep everything in sync.
| Important: Azure integration is disabled By default. Please request your team administrators to enable this feature in Team settings |
Connect Azure to your Conceptboard account
Azure integration on boards:
- Open Board menu
- Select Connect services -> Azure
- In the pop up window that appears, choose Connect to Azure
- If the browser is already logged in, it will direct you to the task list. Otherwise, you can enter your credentials to access your account
- Your Azure account is now connected to Conceptboard
Insert Azure tickets into a board
You can access the search menu in two ways on boards.
Through the connected services menu
Select Import Azure issues
From the Insert menu
Select Insert Widget
Then select Azure Issues
Search menu for Azure tickets lets you:
Select the Azure space you want to see tickets from.
Using the top search bar, choose the tickets you wish to integrate.
Enable search by WIQL query toggle at the top right of the menu if you want to use advanced search.
Select one or more tickets by ticking the checkbox on the left
Select the Insert X issue(s) button.
The search menu will close automatically
The tickets are added as tasks
Azure tasks will appear one by one, arrayed at the centre of your screen
Azure integrated task on the board
Azure task displays the following information:
- Issue summary
- Issue status
- Issue end date
- Issue key and link
- Last synced indicator
- Azure icon
Task colour on task
Custom Labels
Task floating toolbar includes:
- Colour: Changes the task colour line
- Label: Task custom labels for this board
- Sync from Azure: Send all task values from the Azure issue to Conceptboard
- Sync to Azure: Sends all task values from the Conceptboard task to the Azure issue
- Edit Task: Select "Task details", where you can edit more fields than what is visible on the task itself
When an Azure task is syncing, there are three indications on the task or board that this is happening.
A message at the top left corner of the board, and
A copy at the bottom of the task. (See red arrows in image.)
Azure task is disabled (greyed out) for all board users when syncing is in progress.
This step is implemented to avoid concurrent sync requests. While the task is disabled, no interaction with it is possible other than moving it around the board
| Important: It is only possible to sync one task at a time |
Azure Task Details menu
You can access a detailed view of the Azure task:
- Select the ticket
- Select the Edit task option on the floating toolbar
- A pop-up will appear with the task’s details
The pop-up includes (some of the values can be edited):
- Issue Link
- Issue Type
- Priority
- Summary
- Assignee
- Reporter
- Status
- End Date
To update the task in both Conceptboard and Azure:
Select the Update Task button
Select Cancel to cancel all changes
Disconnect Azure account on boards
To disconnect your Azure account from Conceptboard:
- Open Board menu
- Select Connect services
- Select Azure -> Disconnect Azure account (This option is only available if you already have an account connected)